Extension of Abu-Rawash Waste Water Treatment Plant, Giza, Egypt

Client: Arab Contracting Company, Egypt.

Owner: The Organization for the Execution of the Greater Cairo Potable Water and Wastewater Projects.

Consultant: Arab Consulting Engineers (Moharram – Bakhoum), Egypt.

Assignment: Tunnels design and structural analysis of Pipe Jacked tunnel and its effects on existing structures (Tanks- elevated and surface channels – buildings..etc.) using 2D FE modeling and soil strengthening technologies- Design of the New By Pass Channel

social position

Share this post